October is often characterised by mild, or even warm, day time temperatures but cold nights, sometimes accompanied by ground frosts, which can bring any late growth to a sudden halt. A number of recent Octobers have been very wet, with well above average rainfall recorded in 2004, 2005 and 2006.

From a golfing perspective, the start of the month is often very good bu,t as daylight steadily reduces, even a mid afternoon tee time becomes too late for a full round to be completed.

The main competition season usually ends on the first weekend of the month, and that generally signifies the start of end of season renovation work if it has not been completed earlier. As the level of night time dampness increases and temperatures fall, there is an increasing risk from disease attack and, for the remainder of the year, pressure from disease is at its peak.

Greens

For many courses, October is still the main month of the year when major renovation work to the greens is completed. This is largely a result of a full and busy playing season and, with it, the risk that recovery from coring, tining and scarifying will be slow.

IMG_6588  Blowing cores into line ready for collection  Abbotsley.JPG

IMG_5899 Coring greens surround & collar Eccleston Park.JPG

As soil temperatures decrease, growth is also in decline and it may take some time for the surfaces to recover, especially if overnight ground frosts occur. However, that is a choice for individual clubs/courses to make, and all concerned need to accept the reality of a late season renovation programme. Late deep scarifying should be avoided unless absolutely necessary, although a light pass at less than 12mm depth should recover fairly quickly.

Coring with traditional 13mm tines is the norm and unless rootzone conditions are wet, then this operation should be completed within a couple of days with a clean surface remaining. Topdressing with a straight sand mix or with a 10 to 20% addition of organic material will follow immediately and at least 1 ton of material will be required per green.

IMG_7468  Axis worked into core holes  Hampton Court.JPGThis must be thoroughly brushed/matted/blown into the core holes. A further light dressing may be needed to smooth the surface and fill the remaining holes, but care must be taken not to smother the surface and increase the risk of disease attack. Any amendments, such as Axis, can be added to the mix or applied afterwards; this being especially beneficial in shaded areas or in hollows that tend to gather moisture.

The benefit here is the increase in pore space which improves drainage and air circulation within the rootzone. For those opting for deep tining, much the same criteria applies, but even more material may be necessary, but again there is a need for caution to prevent smothering. In all cases, periodic rolling will help to restore surface smoothness.

Mowing frequency will steadily decrease and, by the end of October, the HOC should be at or close to 5mm but there are, of cours,e exceptions depending on the standard of course and grass species present. Unless faced with an autumn drought, irrigation will not be required. There will be a need to maintain a balanced nutrient level within the turfgrass, more so if the greens are to be renovated, since this will aid recovery.

However, too much Nitrogen and succulent growth leads to an increased threat of disease. Any feeding programme should contain a mix of low N, high K plus a small amount of chelated Iron. Other small additions of Calcium, Magnesium and Seaweed extracts can help to form part of the overall feeding programme which gives the plant sufficient nutrient and helps to strengthen the plant cell wall. Another useful addition to any mix is phosphite as mentioned in last month's article; this acting as a mild fungicide.

With surface dampness steadily increasing as cooler night temperatures continue, it is important to reduce the level of dew by applying a penetrant or dew dispersal product. This product is merely a useful addition to reduce the risk of disease, and all necessary cultural and other methods of turfgrass management must continue.

Tees

Mowing requirement is likely to remain at twice per week to start with, but reducing to a single cut by the end. Once the last main 'summer' competition is over, the teeing areas should be scarified or tined (possibly both) and then topdressed afterwards. Where dwarf rye is the dominant or preferred choice of grass for wear tolerance, then overseeding can still be contemplated; perhaps more so in southern England.

Once any renovation work is complete, then the HOC can be raised by 1 or even 2 mm to give greater protection from wear. An autumn feed may be required, but this will be based purely upon the needs of the turf and largely dependent on when the tees were last fed. The standard requirements of low N and high K should continue. Where earthworms are a problem, the first application of Carbendazim may be necessary, although generally this is not usually required until the following month.

Surrounds

Collars and front approaches or 'aprons' may require an end of season aerifying and topdressing and, if so, this should be similar to that carried out on the greens. In general, this work is limited to key areas but, where summer drought stress occurred on high ridges, shoulders etc, then the importance of such work will be much higher on the agenda.

Care must be taken around sprinkler heads and the depth of tining must not be at risk to underground irrigation pipes. The main area of greens surrounds may require some limited tining and dressing, more so in worn areas or where traffic flow is restricted. In heavily worn areas, overseeding should follow once the initial work is complete. Similar to tees and banks, worm control may be required if the course has a high presence of earthworms.

The application of a sulphur based fertiliser may suffice but this must be part of a planned programme to avoid over acidifying the surface, albeit unlikely on greens surrounds. The use of sharp sand in key areas is another alternative, especially if ground conditions tend to be heavy and wet during the winter months. October may also see the start of using traffic control measures for controlling wear around greens and bunkers.

The use of post and rope must be discreet and, fortunately, there are good product examples on the market which are unobtrusive to the golfer, but give the desired effect.

cold-ashby-golf-club-045_website.jpg

Mowing requirement is now likely to be a weekly task unless growth dictates otherwise, with the HOC remaining at between 14mm and 17mm. Much will depend upon individual circumstances and current moisture levels and soil temperatures. With the pressure on mowing reduced, it should be less of an issue to choose a dry time for mowing, and possibly spread over two days.

Scarifying in October remains an option for those courses where a build-up of fibre has occurred, although this task is better carried out earlier due to a faster recovery period. However, the same criteria applies re. depth and cleaning up debris as mentioned in the previous article. October is usually the month where deep tining or slitting can commence but, again, this will depend upon individual course conditions and requirements.

Leaves will start to fall in greater amounts as the month progresses, therefore periodic use of a blower will be needed to keep the main playing areas clear. With regards to feeding, a few courses may benefit from an autumn/winter feed, but this is likely to be limited to either high end properties or those on particularly weak or stoney soils and where grass cover is poor.

Worm control could be required before the month ends but, generally, this is held back until November unless conditions dictate an earlier control. Bearing in mind a full course treatment costs around £1k, a second application can prove a costly hit to many clubs.

Roughs

The mowing requirement will be reduced, and many clubs may only need to cut the rough a couple of times during October. Management of deep or out of play rough should continue when time permits with a view to 'cleaning' and 'topping' all areas before the season draws to a close. Blowing leaves and debris clear will possibly gain in importance unless the course is largely devoid of trees. Any remaining weed will now have to wait until the following year but, for most courses, this should no longer be an issue.

IMG_7040  Blowing out sand from bunker face  Royal Porthcawl.JPG

Maintenance will continue with regular edging and trimming but, with growth fast reducing, there should be less routine work to complete other than raking and blowing sand clear from the surrounding banks or faces. As the month progresses and the main renovation work to greens and tees are completed, then a start can be made to any bunker renovations that are planned for the winter season.

Such work will have been planned and costed in advance and should be part of a rolling capital improvement. This work is usually carried out in-house unless on a large scale project. With drainage, erosion and wash-out the likely key challenges to overcome, it is important that any planned changes are effective in overcoming such problems.

There are many different methods of renovating bunkers, so choose one that is relevant to the objective intended and within the agreed cost.

Other

Lakes/Ponds/Ditches: In October the main task will be a general trimming and tidying of water edges and ditch lines. This is also the last month where water levels are likely to remain low, therefore planned excavation work should be completed before the month ends. See previous comments in September regarding this type of work.

Paths: This should be a quiet month since all glyphosate work will have been completed, and the paths should still be in reasonably good condition bar the odd pothole that should be filled as soon as possible.

IMG_3869  Hedgerow bordering 4th hole Heron  South Essex.JPGTrees: Continue to remove any overhanging branches that pose a nuisance to both golfers and equipment, along with any unwanted growth around the base. With leaves starting to fall, the need to clear these up will gain in importance therefore ensure that all blowers are ready for use. Where hedgerows are present and an integral part of the course, trim only straggly growth since these are important habitats for a multitude of small creatures and insects, and should remain largely untouched unless causing a nuisance to play, and only when absolutely necessary.

Watchlist:

Disease: During October, the main threat of disease is likely to be Fusarium although, if temperatures remain mild, Anthracnose may also prove troublesome where the turf has been under stress. With regards to Fusarium, this is the most common disease that affects turf in the UK and was covered in reasonable detail in last month's article.

Apart from the necessary cultural and environmental practices that need to be in place as part of an IPM strategy, preventative action will include applying a mix of products containing the chemicals Tebuconazole (systemic) and Prochloraz (Translaminar) along with a Strobilurin, tank mixed with an adjuvant for better product performance. While temperatures remain reasonably good at this time of year, the systemic or preventative route is the one to take if chemical control is necessary. Attention should also centre on any nutrient input listed earlier under 'Greens'.

Pests: The risk of turf damage from any pests during October continues to be relatively low. However, as ground conditions become increasingly moist or even wet, then earthworms may start to pose problems on soils which are heavier in nature or are alkaline based. Low pH soils and those on sand are less likely to be affected.

Only badly affected areas should be treated with Carbendazim this early in the season due to the cost of the product required.

Turf Disorders: Any drought stress or dry patch issues should be coming to an end by this time of year although some renovation work to putting surfaces may be required as a result. If Black Layer exists in the green then this should be treated as a matter of urgency with the key aim of oxygenating the soil by frequent aerifying and thatch removal. Applying activated charcoal will help to neutralise the hydrogen sulphide, but the BL will return if the rootzone conditions are not improved.

IMG_1784  Clean equipment  Sherfield Oaks.JPG

Servicing and checking of equipment to continue on a daily basis, with the emphasis on preventing oil damage from leaking or damaged pipes, motors and valves etc. Safety switches and cutting units should also be checked each week and any damage recorded & reported for urgent repair. Sharpness of cylinder reels needs to be checked since cutting with blunt blades can add to the risk of disease pressure.

Irrigation:

The system should no longer be in use, and next month it should be scheduled to be drained down for the winter. Any repairs to leaking valves, pipes, cable breaks and so on should be completed before being shut down, in order that the system is fully up to speed as best as can be assessed, and to limit any down time for the next season.

Compound:

As in previous months take any opportunity to tidy up external areas of the compound and to check on supplies of sands, gravel, fungicide and wormicide which are likely to be required over the coming months.

Laurence Pithie MG
Turf Master One Ltd

Tel 07774 414207
www.turfmasterone.co.uk

Article Tags:
Golf