March Golf Diary 2010
March is regarded as the start of spring with average temperatures in the UK of around 5° Celsius. Although day time temperatures are over 3° higher, overnight frosts and cold evenings 'pull back' any real signs of growth, apart from perhaps in the south of England.
Rainfall during the last decade has tended to be below average; the two exceptions being in 2001 and 2008 where heavy rain continued to delay the onset of spring and hampered pre-season work.
The amount of sunlight will be considerably more than in February and, by the end of the month, the hours of daylight and darkness will be equal. Often, there will be days when spring has most definitely arrived whereas other days will feel like a return to winter, therefore beware of the 'false spring' and avoid pushing growth and for lowering the HOC too early.
Greens
This is a key month for renovation work to take place before the season gets underway; the 'unofficial' start date being the 1st of April.
Soil temperature for most will not rise above the 6° Celsius mark until the latter half of the month, therefore recovery and growth will be in short supply until well into the following month.
Therefore, in order to provide an acceptable playing surface, there needs to be a balance between the agronomic needs of the turf and the wishes of the golfers. That said, much will depend on the condition of the green and the desired objective. Recent trends have shown that many Course Managers prefer to carry out coring work with 3/8th or less tine sizes, and then follow-up with micro-coring in April.
The larger ½ inch coring operation is then left until August when conditions are usually ideal for such work and a much faster recovery ensues. Where deep scarifying is the preferred option for thatch control, this practice is best carried out later in the season when there is sufficient growth for recovery.
Attempting to deep scarify in March, when cold easterly winds are likely to follow, is fraught with potential problems, as well as golfer annoyance, so best to avoid if possible. Prior to any light scarifying, coring or tining work, the greens should be given a light spring start-up feed, but just enough to encourage growth and recovery.
A main pre-season or base feed, usually with a granular product would then be applied in April. The first main top dressing of the season will quickly follow the chosen cultural practice, where as much as 1 ton per green of dressing would be applied; this depending on the size of the green and whether or not core or deep tine holes need to be filled.
Any planned overseeding should be held back for a few weeks until soil temperatures are favourable for germination. The temptation to reduce mowing height should be left until the greens have 'settled-down' and there is clear evidence of recovery, therefore the HOC should remain at around 5mm for as long as possible.
Beware the false spring! Any risk of a late surge of disease pressure from Fusarium should be minimal, but avoid pushing growth and smothering the surface with topdressing. March should see the bulk of the pre-season work completed, but more will be required the following month before the playing surfaces move nearer the desired level.
As always, the above is an overview or generalisation and where shade, wind exposure, high rainfall and so on persist, then such conditions need to be 'factored' into the overall management plan.
Tees
For teeing areas, much will depend on whether or not the main playing areas are being rested or have been in use throughout the winter. If the former, then ideally they should be fertilised, tined, dressed and overseeded before being brought back into play. For tees which are in use all year round then much the same is likely to apply, although a small section may be left undisturbed to accommodate play for the next 2 to 3 weeks.
For larger teeing areas this may be an option but, where teeing space is limited, it really comes down to doing the best possible in the current situation. Where separate winter teeing areas are in play then any renovation work should be undertaken once they are no longer in use, which for most will be the following month. Similar to greens, tee mowing height should remain at a higher height until growth commences and new seedlings have germinated.
Any overseeding that takes place will have a better chance of success if topdressed afterwards and mowing height is not lowered.
Surrounds
Towards the end of the month, there should be the first signs of recovery from winter wear. Heavily 'trafficked' areas will be the last to recover and, where this is the case, and in spite of installing traffic control measures, such areas should be treated similar to tees. For many courses, this may require treating small areas where grass cover is weak.
Once treated, these areas should be protected as much as possible from resultant wear. Only in essential areas should re-turfing be contemplated due to the risk of the turf drying out. Where this is deemed necessary then the possible need for watering must be readily accessible. Green surrounds can be fertilised late in the month if required and conditions are favourable.
Too often, ground conditions can dry out fairly quickly if winds are in an easterly direction and such applications should be held in abeyance until warmer and moisture conditions prevail. If cold and dry conditions continue for any length of time, a foliar feed may give some respite without the risk of scorch.
Fairways
This is the last month that deep tining work can be carried out before the season gets underway. Although best carried out earlier in the year, ground conditions may dictate that this is not possible. Fairways often take on a bleached appearance in March and lose any real definition.
This scenario can be overcome by applying a mix of urea and iron which many would regard as being more of a 'cosmetic tonic'. At roughly a 25kg bag of urea per fairway mixed with a soluble iron product, the total cost to apply to all fairways should be around £200 and may help to give the club a competitive edge.
This should suffice for a few weeks until higher temperatures allow for normal growth. Where nutrient levels are low and the turf is in need of a boost, then a suitable fertiliser can be applied from late in the month onwards, especially in the southern half of the UK. Controlled release fertilisers have proved popular in the past but they are expensive and can lead to a build-up of excess fibre.
Every course is different and applications can vary, from foliar applied a few times per year to more sulphur based granular products that have an acidifying effect on the turf. This would generally be applied once or maybe again in autumn as a winter feed. Mowing will continue but, again the height of cut should remain high, since the risk of overnight frosts will not have disappeared just yet.
Bunkers
The emphasis should now be on presentation and playability for the coming season, with all major renovation work now complete. If general trimming, edging and topping up of sand levels is not already underway, then a start needs to be made as soon as possible.
Additional sand should have sufficient time to 'bed down' before the new season but, if not, then it can be watered and consolidated using a 'whacker plate' or similar. This will help to avoid the 'plugged lie' syndrome in bunkers. Since growth around bunkers is likely to be sparse, the removal of excess sand is essential.
A back pack blower is ideal for this purpose. Weak areas can be fertilised and, where possible, a sufficient length of grass can be left on the bank or bunker face, especially on south facing slopes. Where renovation has taken place earlier in the winter, such bunkers should be close to being brought back into play.
Other
Paths: Once the main work to greens, tees and surrounds etc are complete and, following bunkers, paths are likely to be next in the list of priorities for pre-season renovation. Once any holes have been filled and any debris scraped clear or removed, then a light dressing of the appropriate material can be applied, possibly via a belt dresser type hopper.
Freshly re-surfaced paths can give an enhanced aesthetic appearance to the course, and the secret is to treat and apply on a regular basis as opposed to a full scale and costly renovation. Where path ends have become worn, they should be treated as per green surrounds and given protection from wear as much as possible. See similar comments in previous diary regarding the possibility of last minute turfing repairs.
Course Accessories: This is the last month for these to be cleaned, repaired and re-painted ready for changing in time for the start of the new season. Any items such as flag pins, hole cups, bunker rakes and so on that are required need to be ordered well in advance to prevent any undue delays.
Hazard markers are often painted 'in situ', especially if there are numerous ditches or water features present on the course. Wet days are ideal for painting and then storing on some form of racking system.
Watchlist:
Disease: Likely to be very low at this time of year unless the prevailing conditions are moist and warm with limited wind speed allowing conditions to favour a return of fusarium.
Pests: Apart from any lingering earthworm activity, leatherjacket damage may be rearing its head at this time of year. It is not uncommon for the larvae to have survived the winter and as they grow larger, their appetite for food becomes greater.
Roots of turfgrass can be eaten, and the first signs of such damage can be increased bird activity and/or discolouration of the turf as the roots die back. Fortunately, this pest can be easily controlled using the active ingredient Chlorpyrifos, and then mixed with a suitable penetrant to give maximum effect.
Turf Disorders: See past comments regarding algae and black layer and last month's note on moss and its control. It is still too early to aggressively treat moss but, as mentioned previously, aim to get the basics right then moss is less likely to be a troublesome pest.
Equipment and Irrigation:
All major overhauls, servicing and sharpening of equipment should be completed by the end of the month and service records brought up to date. Towards the end of the month, the irrigation system should be primed and tested, then a list made of any leaks, damages or poorly performing sprinklers.
Once a full check of the system is complete, then it's a case of prioritising what repairs are most needed, usually the pumps and main line first, followed by valves and sprinklers. Most pipe fittings and other necessary components should be held in stock otherwise ordering needs to take place asap.
Initial testing of the system may take more than one day to complete, and golfers should be advised in advance that such work will be in place, since no one appreciates a cold shower in March!
Compound:
See previous articles regarding cleaning, painting and organising, all of which should be completed by the end of this month.
Staff:
As stated last month, this time of year and before the new season gets underway, is the ideal time to complete staff appraisals. Training should be on-going both internally and out on the course with all records brought up to date.
Laurence Pithie MG
Turf Master One Ltd
www.turfmasterone.co.uk